DHL MechZB48 Dinslaken


Erection of a mechanical delivery base in Dinslaken

Client: Baugesellschaft Walter Hellmich GmbH

Customer: Walter Hellmich GmbH

In 2012 a mechanical delivery base (Mech ZB48) was built in Dinslaken for the Deutsche Post DHL to deliver packages in the Dinslaken / Oberhausen area. Therefor an unsupported warehouse of 43.00m clear space distance and 89.00m in length was erected. This type of building was specifically designed for an automated sorting plant which is capable of sorting up to 3,000 packages per hour and distributing them on the slides for the different postal zones. Next to the base building the office and social building was built for about 70 employees. The plot area is about 16,300m², the gross floor area 4,200m² and the gross volume 37,200m³. The production costs add up to approximately 10 m Euros.

Our performances:
• Design planning of the building and outdoor facilities
• Building application process
• Static design
• Detailed and approved final design
• Co-ordination of the professionals for geotechnics, fire protection, building services and outdoor facilities
• Co-ordination of the precast concrete unit concept
• Static calculations of the sleeve foundation
• Formwork and reinforcement drawings

as PDF-Document…

 

More DHL MechZB Projects:
DHL MechZB 96 Essen
DHL MechZB 60 Wuerselen
DHL MechZB 60 Hamm-Uentrop

Further Logistics Projects:
Red Parcel Package Centre
Logport Duisburg – Building LMN
Logport Duisburg – Building IJK
Logistics Centre Kuehne + Nagel CP 2
Logistics Centre Kuehne + Nagel CP 3+4
HSE24 – Greven-Reckenfeld