Administration building HDM – Holz Dammers Moers


Addition of storeys and expanison of an administration building incl. overbuilding a truck thoroughfare

Client: Arnold Dammers GmbH & Co. GbRmbH

Costumer: Arnold Dammers GmbH & Co. GbRmbH

In a three storey administration building the office space had to be doubled.
The already existing building could only be extended by one storey because of the static analysis. Therefore a filigree steel structure was used.
Because of the small space available it was necessary to build three more storeys over the truck thoroughfare next to the office building. Also this part was built with a steel construction.

Our performances:
• Preliminary design, feasibility studies
• Design development, visualization
• Managing application process for building permit
• Static calculations
• Construction drawings
• Detailed and approved final design
• Tendering process
• Allocation of contracts
• Construction supervision
• Accounting control, acceptance

as PDF-Document…

 

Further Commercial Construction Projects:
Zukunft GmbH
Klöckner Stahl- und Metallhandel
DTS Systemoberflächen GmbH