WSW Wuppertaler Stadtwerke AG


Upgrade of the CHP Wuppertal-Barmen

Client: WSW Wuppertaler Stadtwerke AG

Customer: DSD Industrieanlagen GmbH

The CHP (combined heat and power station) was modified in the area around a former coal boiler. Therfore two gas turbines for electric power generation with heat recovery were installed. The load-bearing structure could widely be obtained but in some areas severe building alterations were necessary. The two kettles for the heat recovery have chimneys that are 60m high. Kettles and chimneys were placed in / or on a new building in front of the existing building. The construction costs add up to approximately 4.3 m Euros.

Our performance:
• Preliminary design and coordination with the plant designer
• Managing application process for building permit
• Static calculations
• Formwork and reinforcement drawings
• Steel construction workshop drawings
• Tendering process
• Allocation of process
• Construction supervision
• Accounting control
• Photo animation, construction sign